Horry guarantees every critical position of the pipeline integration model, and the visualization of the DFMA baseline model with high accuracy assists in the efficient layout of the pipeline integration.
We strongly believe that coordination should be regarded as an important discipline. Our team is an experienced coordination team that specializes in working closely with your BIM and CSD design teams on behalf of MEP contractors to mitigate the risks involved in executing contractual MiMEP implementation requirements and instructions during construction.
We utilize our deep technical knowledge from the industry to pre-coordinate the M&E subcontractor's piping consolidation/construction drawings during the design phase. This proactive approach allows us to identify and resolve potentially high-cost issues that may impact your budget - issues that typically arise during construction. Once the third contractor becomes involved, the constraints faced by the M&E subcontractor increase significantly. Therefore, value coordination is more important than value engineering.
We estimate an average construction cost saving of 4.5% to 7% prior to subcontracting. These figures are verifiable and our existing customers support this.