We're beyond honored to announce that HORRY MiMEP / DfMA SOLUTIONS has played a pivotal role in the award-winning Kwu Tung (KTU) Station project on the East Rail Line! 🏆
In close collaboration with MTR Corporation Limited, Dragages Hong Kong Limited, and BYME Engineering (Hong Kong) Ltd., HORRY successfully delivered over 600 MiMEP and DfMA modules. Our involvement spanned the entire project lifecycle—from initial design and factory production to assembly and precision site surveying/setting out.

What makes this project a milestone?
·Highest MiMEP adoption rate among over 100 MTR stations
·100% local off-site assembly in Hong Kong, unique among award-winning projects
Why "Local" Matters:
While MiMEP is often associated with outsourcing, our "Design for Manufacture" (DfMA) approach allowed us to reduce costs while keeping high-value assembly jobs in Hong Kong. In these challenging times, we believe innovation should empower our local workforce, not replace it. By optimizing efficiency and shortening the site schedule, we've proven that "Smart Construction" and "Supporting Local Labor" can—and must—go hand in hand. 👷♂️🤝
A huge thank you to our partners for their trust. Let’s continue to build a smarter, more sustainable Hong Kong!